+86-510-87852861 Gewabin@163.com
Categories
Contact Us

Add: Industrial Concentration Zone(North) Of Wanshi Town, Yixing District, Wuxi, Jiangsu Province, China

Tel: +86-510-87852861

Fax: +86-510-87853861-801

Mob: +8613867612832

E-mail: Gewabin@163.com

20 Ton Cross Flow Closed Loop Cooling Tower

The 20 ton cross flow closed loop cooling tower consists of a drive system, a water tank, and a circulating water pump. The main body includes casing, heat exchanger, fan, water purifier, water tank and piping. Closed cooling towers are particularly suitable for use in harsh environments where water is scarce....

Send Inquiry Chat Now

Product description

The 20 ton cross flow closed loop cooling tower consists of a drive system, a water tank, and a circulating water pump. The main body includes casing, heat exchanger, fan, water purifier, water tank and piping. Closed cooling towers are particularly suitable for use in harsh environments where water is scarce.

The parameter of 20 ton cross flow closed loop cooling tower 

Model



GWBB-20T

Medium



Water(H2O)

Cooling type



Cross flow

Total power


kw

3.75

Operating weight


kg

3010

 Dimension


mm

1830x2200x2950

Basic structure

Casing material


Aluminium Zinc Plate

Casing thickness

mm

2.0


Base frame material


Carbon steel


Anti-corrosion way


Hot-dip galvanzing


 

 

Axial Fan

Motor Brand


Siemens

Qty.

set

1


Blowing rate

m3/h

40000


Power

kw

3.0


 

 

Water circulating pump

Motor Brand


WEG

Qty.

set

1


Water volume

m3/h

30


Power

kw

0.75


Water lift


5m


PVC fill  and Drift eliminator

Material


Modifled flame retardan PVC

Advantage of cooling tower operation:

1.VS. Cooling Tower +Heat Exchanger Combination
Closer approach to wet bulb temperature and reduce fouling, highly improve process efficiency 
2.VS.Air-Cooled Systems
10-20°C lower process temperatures ,less required space and lower energy consumption 
3.VS.Once –Through Systems
Reduces environmental impact ,saving up to 95% of the cooling water
4.Reduced installed Cost And Space Requirements
Effectively combines the function of a cooling tower and heat exchanger into one piece of equipment,reduce required piping and system complexity.

Our workshop

_I~JX998QJ]RK38ANTZQ]DA

Packaging & Shipping

1.Standardized modular design, two body parts: upper body part and bottom body part;

2.Shipped by one 40ft container,upper and bottom body parts shipped assembly and separately.

3.Body parts will packed with plastic film to anti moisture, shipped assembly.

Delivery time: 30-35 days after full payment