+86-510-87852861 Gewabin@163.com
Categories
Contact Us

Add: Industrial Concentration Zone(North) Of Wanshi Town, Yixing District, Wuxi, Jiangsu Province, China

Tel: +86-510-87852861

Fax: +86-510-87853861-801

Mob: +8613867612832

E-mail: Gewabin@163.com

Closed-Circuit Cooling Tower Cross Flow Type For Industry

The closed-circuit cooling tower cross flow type for industry operate in a manner similar to open cooling towers, except that the heat load to be rejected is transferred from the process fluid (the fluid being cooled) to the ambient air through a heat exchange coil. The coil serves to isolate the process fluid from the outside air, keeping it clean and contaminate free in a closed loop....

Send Inquiry Chat Now

Product description

The closed-circuit cooling tower cross flow type for industry operate in a manner similar to open cooling towers, except that the heat load to be rejected is transferred from the process fluid (the fluid being cooled) to the ambient air through a heat exchange coil. The coil serves to isolate the process fluid from the outside air, keeping it clean and contaminate free in a closed loop. 

Principle of Operation

W5YS})NT[K)]KE20](A~)ME


1.Spray water circulates over the coil and mixes with the outside air in an  external circuit.

2.The process fluid circulates inside the coil in an  internal circuit

3.During operation, heat is transferred from the internal circuit, through the coil to the spray water, and then to the atmosphere as a portion of the water evaporates.

Advantage 

1.VS.Cooling Tower +Heat Exanger Combination
Closer approach to wet bulb temperature and reduce fouling, highly improve process efficiency 
2.VS.Air-Cooled Systems
10-20°C lower process temperatures ,less required space and lower energy consumption 
3.VS.Once –Through Systems
Reduces environmental impact ,saving up to 95% of the cooling water
4.Reduced installed Cost And Space Requirements,

Effectively combines the function of a cooling tower and heat exchanger into one piece of equipment,reduce required piping and system complexity.

Production process

内页图

Packing & Delivery

Packing Details

1.Two body parts: upper and bottom boxes.

2.Packing with plastic film

3.Shipped by one 40ft container. Upper and bottom body parts are separated in the same container.

Delivery time:

shipped in 30days after payment